SSGCOpen

Components for Remus G-1.6, Gas Meters (Diaphragm), Qty=500,000 Nos. (As per Specification & Drawing) (Under Single Stage One Envelope Bidding Procedure). The bidder is required to submit/upload the Valid PEC Certificate mentioned in the Tender Document/Advertisement (where required) along with the Bid on EPADS-v1.0 else the bid will be liable for rejection. This tender is available on the EPADS-v1.0 link: https://eprocure.gov.pk/#/auth/login. Bidders/suppliers/contractors should participate in

Sui Southern Gas Company Limited (SSGC)

Buyer
Sui Southern Gas Company Limited (SSGC)
Tender reference
SSGC/FP/PT/EPADS-1/14554
Industry category
Needs classification
Official procurement category
Not supplied by source
Location
Pakistan
Closing deadline
8 Dec 2026 · 11:00 PKT
Published by
SSGC

What this opportunity is about

Components for Remus G-1.6, Gas Meters (Diaphragm), Qty=500,000 Nos. (As per Specification & Drawing) (Under Single Stage One Envelope Bidding Procedure). The bidder is required to submit/upload the Valid PEC Certificate mentioned in the Tender Document/Advertisement (where required) along with the Bid on EPADS-v1.0 else the bid will be liable for rejection. This tender is available on the EPADS-v1.0 link: https://eprocure.gov.pk/#/auth/login. Bidders/suppliers/contractors should participate in this tender through EPADS-v1.0. Supplier should download tender document through EPADS-v1.0, fill BOQ/ Bid form/ schedule of requirement and upload all tender documents with sign and stamp through EPADS-v1.0 otherwise bid will be treated as rejected. The bidder must deposit/submit the physical fixed bid bond to the Tender Room (SSGC HO) before the bid submission date & time, otherwise the bid will be liable to be rejected.

Before preparing a bid

Use this checklist to review the publisher’s latest notice and attachments.

  1. Confirm the scope, eligibility criteria and required registrations.
  2. Check the bid security amount, format and validity period, if required.
  3. Review submission instructions, opening time and any published amendments.
  4. Confirm the closing date and time on the official notice before submitting.

Notice and documents

The publisher’s record is authoritative for all requirements and updates.