Components for Remus G-1.6, Gas Meters (Diaphragm), Qty=500,000 Nos. (As per Specification & Drawing) (Under Single Stage One Envelope Bidding Procedure). The bidder is required to submit/upload the Valid PEC Certificate mentioned in the Tender Document/Advertisement (where required) along with the Bid on EPADS-v1.0 else the bid will be liable for rejection. This tender is available on the EPADS-v1.0 link: https://eprocure.gov.pk/#/auth/login. Bidders/suppliers/contractors should participate in
Sui Southern Gas Company Limited (SSGC)
- Buyer
- Sui Southern Gas Company Limited (SSGC)
- Tender reference
- SSGC/FP/PT/EPADS-1/14554
- Industry category
- Needs classification
- Official procurement category
- Not supplied by source
- Location
- Pakistan
- Closing deadline
- 8 Dec 2026 · 11:00 PKT
- Published by
- SSGC
TENDER SUMMARY
What this opportunity is about
Components for Remus G-1.6, Gas Meters (Diaphragm), Qty=500,000 Nos. (As per Specification & Drawing) (Under Single Stage One Envelope Bidding Procedure). The bidder is required to submit/upload the Valid PEC Certificate mentioned in the Tender Document/Advertisement (where required) along with the Bid on EPADS-v1.0 else the bid will be liable for rejection. This tender is available on the EPADS-v1.0 link: https://eprocure.gov.pk/#/auth/login. Bidders/suppliers/contractors should participate in this tender through EPADS-v1.0. Supplier should download tender document through EPADS-v1.0, fill BOQ/ Bid form/ schedule of requirement and upload all tender documents with sign and stamp through EPADS-v1.0 otherwise bid will be treated as rejected. The bidder must deposit/submit the physical fixed bid bond to the Tender Room (SSGC HO) before the bid submission date & time, otherwise the bid will be liable to be rejected.
NEXT STEPS
Before preparing a bid
Use this checklist to review the publisher’s latest notice and attachments.
- Confirm the scope, eligibility criteria and required registrations.
- Check the bid security amount, format and validity period, if required.
- Review submission instructions, opening time and any published amendments.
- Confirm the closing date and time on the official notice before submitting.
OFFICIAL RECORD
Notice and documents
The publisher’s record is authoritative for all requirements and updates.